Podcast · Projects · 8 February 2023 · 9m
Inside a hotel project in its last stage of construction
The founders left the office to walk a hotel floor while the fit-out crew was still working

In this episode
What it covers
Recorded on site rather than in the studio, with the lobby unfinished and the rooftop reached on foot. The hosts walk through the ownership options, the operator agreement behind the building, and what the commercial floor will hold. For anyone weighing a room in a managed hotel.
- A global operator brings its own booking network and its own build standards
- Different ownership structures sit side by side in the same building
- The commercial floor signs its own tenants, from a gallery to a bar
If you liked this one

Ross Woods on how a hotel is forecast, not guessed
The advisor who wrote a luxury hotel standard on the costs every forecast leaves out.What an operator actually does once the building is finished and open
Joni Artawan on building through the worst rainy season yet
A project director who dug a basement through the wettest season he has ever worked in.Another site walk, this time with the people running the build
Chad Egan and Pierre Avenard inside a build near the end
Members of the team inside a build close enough to the end that the finishes are already in.If site visits are your thing, here is a later project at the same stageFrom the journal

5-Star Reviews Are Pouring in for TUI BLUE Berawa
How guests rated a completed hotel in our portfolio in its first months of trading.
Investing in Luxury Hotels: Why High-End Hospitality Is Redefining Property Investment
What separates luxury hospitality from rental property as an asset, and where its income comes from.
TUI Blue Berawa is Now Open
What the soft launch of a completed hotel in our portfolio means for its guests and its investors.Find out more about hotel and resort investment with Geonet.